Cooktown Constructions needed two specialised, skilled labourers for the Kia Melville project, in a role that wasn’t limited to a single trade.
Early in the project, the focus was tilt panel works. As the build moved through its later stages, the same two labourers stayed on and turned their hand to whatever the project needed next, rather than being replaced as the scope of work shifted.
The placement ran from October 2025 through to May 2026, with the same two people on site for the length of the project.